Architectural Bid submissions
Whilst working at an architectural practice, I worked on a number of bid submissions. The work involved creating an ad hoc brand + producing printed documentation within tight deadlines, whilst working with numerous teams to obtain all the content under the bid requirements.
Working regularly with clients working in-house, desk side to ensure content could be signed off as it was being written + flown into the document.
All print liaison was also required to obtain estimates, ensuring the design brief was possible + to also shift last minute deadlines.
![](http://rachelsharpe.com/wp-content/uploads/GQ-Cover-and-Spreads.png)
![](http://rachelsharpe.com/wp-content/uploads/GQ-Spreads.png)
![](http://rachelsharpe.com/wp-content/uploads/GQ-Spreads-02.png)
![](http://rachelsharpe.com/wp-content/uploads/Dean-Gardens-Covers-and-Spreads.png)
![](http://rachelsharpe.com/wp-content/uploads/Dean-Gardens-Spreads.png)
![](http://rachelsharpe.com/wp-content/uploads/Dean-Gardens-Spreads-02.png)